GSE Tank 1 Lifted Into Position – Thrust Ram Installed on Suborbital Pad A | SpaceX Boca Chica

The thrust simulation rams were installed on Suborbital Pad A in preparation for SN15’s arrival at the launch site, GSE Tank 1 was lifted onto its mount at the orbital launch site, and construction on

Leave a Reply

Your email address will not be published. Required fields are marked *